Concrete Calculator — How Much Concrete Do I Need?
Cubic yards, bag counts and cost for slabs, footings, walls and columns.
At a glance
- Input:
- Numbers you enter
- Processing:
- Runs locally in your browser
- Privacy:
- Nothing you type is sent to a server
Last updated: 2026-11-09
Common use cases
- Working out how many bags to buy before pouring a patio slab
- Budgeting a garage slab, from ready-mix to bagged concrete
- Checking whether a ready-mix truck is worth it for a fence footing
- Estimating the concrete for a retaining wall before ordering
About this tool
Pouring a slab, a footing, a wall or a sonotube column? Work out the concrete before you order it. Enter the size and a waste allowance and this calculator gives you the volume in cubic yards, cubic metres and cubic feet, how many bags you need, and the cost if you enter a price. It runs entirely in your browser — no signup, no upload.
How to use it
- Pick the shape: slab, footing, wall or column (sonotube).
- Choose metric or imperial units — the fields switch between metres/centimetres and feet/inches.
- Enter the size: length, width and thickness for a slab, footing or wall; diameter and height for a column.
- Set the waste allowance — 10% is the usual default. Enter a price per yard or per cubic metre to see the cost.
- Read the result: volume with waste in cubic yards, cubic metres and cubic feet, whole-bag counts for 40, 60 and 80 lb bags, and the estimated cost.
Worked examples
Input: 5 m × 4 m slab, 10 cm thick, 10% waste
Output: 2.2 m³ · 2.88 yd³ · 77.69 ft³ · 130 × 80 lb bags
A small patio slab — 2.2 m³ with the usual 10% waste allowance.
Input: 12 ft × 10 ft slab, 4 in thick, 10% waste, $120/yd³
Output: 1.25 m³ · 1.63 yd³ · 44 ft³ · 74 × 80 lb bags · about $195.56
An imperial slab with a price — the cost is the with-waste volume times the price you enter.
Input: 30 cm diameter column, 1.2 m high, 10% waste
Output: 0.09 m³ · 0.12 yd³ · 3.3 ft³ · 6 × 80 lb bags
One sonotube footing — a fraction of a yard, so bags beat a truck.
Practical tips
- Round up, never down — a short load costs more in delay than an extra bag costs in money.
- Order ready-mix for anything above about 2–3 yd³; below that, bags are usually cheaper once the short-load fee is counted.
- Measure the form twice: a 10 cm slab that ends up 12 cm thick needs 20% more concrete.
Common mistakes
- Forgetting waste — a slab measured exactly is a slab that runs short before the last corner.
- Mixing units — entering feet in a centimetre field, or inches where the tool expects feet.
- Counting bags from the base volume instead of the volume with waste.
How this compares
A ready-mix truck is the cheapest way to buy concrete once the job is above roughly 2–3 cubic yards — one delivery, one pour, no mixing. Below that, bagged concrete wins: no short-load fee, no minimum, and you can buy exactly the bags the calculator counts. For a single sonotube column, bags are almost always the answer.
Good to know
- Volumes assume a perfectly flat form — uneven ground or a bowed form uses more concrete than the calculator shows.
- Bag counts are rounded up to whole bags; a part bag cannot be bought.
- The cost is only an estimate from the price you enter — the calculator never assumes a price.
- Weights are US bag sizes (40, 60 and 80 lb); other countries sell different bag weights.
Frequently asked questions
How many bags of concrete are in a cubic yard?
One cubic yard takes 45 bags of 80 lb, 60 bags of 60 lb, or 90 bags of 40 lb. The calculator rounds up to whole bags — for example, 1.63 yd³ needs 74 × 80 lb bags.
How much waste should I allow for concrete?
10% is the usual allowance and the default here — it covers spillage, uneven ground and the concrete left in the mixer. Raise it to 15% for rough or uneven forms, and drop it toward 0% only for a precise precast mould.
How big is a ready-mix truck load?
A standard ready-mix truck carries about 8–10 cubic yards. Below roughly 2–3 yd³ most suppliers charge a short-load fee, so small jobs often work out cheaper with bags.
Why does the calculator show cubic yards and cubic metres?
US suppliers sell concrete by the cubic yard; most of the rest of the world sells by the cubic metre. The calculator shows both, plus cubic feet, so you can order in whatever unit your supplier uses.
Is my data uploaded?
No. The calculation runs entirely in your browser — your measurements never leave this tab, and nothing is stored.